Risk Allocation: Schedule and Concluding Remarks

video-placeholder
Loading...
查看授課大綱

您將學習的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

審閱

4.8(1,597 個評分)

  • 5 stars
    79.71%
  • 4 stars
    17.84%
  • 3 stars
    1.94%
  • 2 stars
    0.31%
  • 1 star
    0.18%

GV

2020年9月9日

Filled StarFilled StarFilled StarFilled StarFilled Star

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF

2020年5月13日

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

從本節課中

Risk Allocation and Planning

Dr. Eduardo Gamez, Deputy Director of Risk Management for AECOM, introduces Risk Allocation and Planning. Dr. Gamez discusses the importance of formal risk management and how to use risk assessment as a support tool for planning and scheduling.

教學方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我們的目錄

免費加入並獲得個性化推薦、更新和優惠。