Probability of Completing a Project: Normal Distribution

Loading...
Eye
哥伦比亚大学
4.8(826 個評分) | 11K 名學生已註冊
課程 2(共 4 門,营建管理 專項課程
查看授課大綱

您將學習的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

審閱

4.8(826 個評分)
  • 5 stars
    659 ratings
  • 4 stars
    151 ratings
  • 3 stars
    11 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

EJ

Apr 20, 2019

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

從本節課中
Program Evaluation & Review Technique (PERT) and Range Estimating

教學方

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我們的目錄

免費加入並獲得個性化推薦、更新和優惠。