LOB Diagram

Loading...
查看授課大綱

您將學習的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

審閱

4.8(1,392 個評分)
  • 5 stars
    79.66%
  • 4 stars
    18.10%
  • 3 stars
    1.65%
  • 2 stars
    0.35%
  • 1 star
    0.21%
GV
2020年9月9日

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF
2020年5月13日

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

從本節課中
Linear Construction Operations and Line of Balance
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.