Linear Construction Overview and Examples

Loading...
查看授課大綱

您將學習的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

審閱

4.8(1,388 個評分)
  • 5 stars
    79.61%
  • 4 stars
    18.15%
  • 3 stars
    1.65%
  • 2 stars
    0.36%
  • 1 star
    0.21%
VT
2019年12月23日

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF
2020年5月13日

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

從本節課中
Linear Construction Operations and Line of Balance
Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

教學方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我們的目錄

免費加入並獲得個性化推薦、更新和優惠。