Lean: Flow

Loading...
來自 Columbia University 的課程
Construction Scheduling
716 個評分
Columbia University
716 個評分
課程 2(共 4 門,Specialization Construction Management
從本節課中
Lean Design in Construction Scheduling
Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.

與講師見面

  • Ibrahim Odeh, Ph.D., MBA
    Ibrahim Odeh, Ph.D., MBA
    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
    Director of Research and Founder, Global Leaders in Construction Management

探索我們的目錄

免費加入並獲得個性化推薦、更新和優惠。