Examples of Activity Precedence (AON) Diagrams

Loading...
查看授課大綱

您將學習的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

審閱

4.8(1,432 個評分)
  • 5 stars
    79.67%
  • 4 stars
    18.08%
  • 3 stars
    1.67%
  • 2 stars
    0.34%
  • 1 star
    0.20%
GV
2020年9月9日

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF
2020年5月13日

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

從本節課中
Activity Precedence Diagrams
In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

教學方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我們的目錄

免費加入並獲得個性化推薦、更新和優惠。