Advanced Activity Diagrams

Loading...
哥伦比亚大学
4.8(912 個評分) | 12K 名學生已註冊
課程 2(共 4 門,营建管理 專項課程
查看授課大綱

您將學習的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

審閱

4.8(912 個評分)
  • 5 stars
    725 ratings
  • 4 stars
    166 ratings
  • 3 stars
    16 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
BA

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.\n\nThanks to Coursera and to my Instructors.

AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

從本節課中
Activity on Arrow
Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.

教學方

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我們的目錄

免費加入並獲得個性化推薦、更新和優惠。